The NY Power Authority owns, operates, and maintains one-third of the state’s bulk transmission system. Interconnection to the Power Authority network enables projects, including renewable energy projects, businesses, and other entities to connect to the grid by using NYPA’s expertise for a seamless process. 


Did you know? Interconnecting Renewables: The NY Power Authority is enabling more than 12,000 MWs of renewable energy to be connected to the state’s energy grid.


The NY Power Authority can guide you through the load interconnection process

New Load Interconnection

Projects that require significant energy may be able to draw that load from the New York Power Authority's (NYPA) transmission system. For guidance and information about how to connect to NYPA’s transmission system, provide your information through this form.

The Interconnection Process

Connection to NYPA's transmission system starts with applying to receive a NYPA Power Allocation, as well as the submission of an interconnection request to NYISO. Final steps involve executing a Developer’s Agreement and Asset Purchase Agreement followed by construction. The steps and FAQ are outlined below.

 

Download a copy

 

FAQs